Reno Mattresses
Simple Steps to Mattress Construction For easy handling and shipping, Mattresses are supplied folded flat in bundles of 25. Lids are packaged in separate bundles or in rolls for larger units of Mattresses. Step One Individual Mattress is first unfolded on flat, hard ground and stamped to remove all kinks. The two long sides and both end panels are then lifted upright and secured in position by tying the selvedge wires together. Step Two The vertical edges of all internal diaphragms are attached to the sides and laced with typing wire or approved interlocking wire fastener. Step Three The assembled Mattress is then aligned in the required position and tied or fastened to adjacent mattress along the whole length of selvedge wire. Mattress units should be placed in proper position so that movement of rock fill inside the cage -- due to gravity or flowing current -- is minimal. Thus, on slopes, Mattresses should be placed with its internal diaphragms at right angles to the direction of the slope. On river beds, position Mattress with the internal diaphragms at right angles to the direction flow. Step Four Next, the stone is placed into the compartments (cells). If it's a slope, start from the bottom. One or more Mattresses can be filled at the same time. Sequence the installation by keeping the stone filling crew well ahead of the lid placement crew. Lids or top panels must be securely tied or fastened to side-tops and end panels and also to the top of the inner partitions. Step Five Step Six The Mattresses may be either telescoped or cut to form and tied at required shape when necessary, e.g. when Mattresses are laid on a radius. For a sharp curve, it may be necessary to cut the Mattress diagonally into triangular sections and tie the open side securely to an intact side panel.
|
||||||||
|
||||||||