The goal was to repair and reinforce the existing asphalt along a railway by using an interlayer technology within the newly paved asphalt lift.
Distressed pavement at container transfer facility presented long term performance challenges. The project consisted of the milling of existing asphalt over a 4.5 acre area, creating an expensive scope of work for the client, and creating a pressure to ensure that the rehabilitation solution was long term.
The project site was easily accessible for all types of necessary demo and installation equipment. The existing, aged asphalt surface showed signs of reflective cracking and was in dire need of repair.
With Mirafi MPG4 the project team was able to supply a cost effective,timely solution that addressed reflective cracking, waterproofing, and reinforcement needs of the site. This resulted in an improved performance cycle of pavement section, reducing overall maintenance costs.
When it comes to civil sitework project challenges, a clear path for determining your optimal solution can be cumbersome. The myriad of pavement & site stabilization, erosion & sediment control, stormwater, and grade separation solutions has become overwhelming. Request information on how we can help advise and optimize your next civil sitework project today!